Environment. The under-construction Akkuyu NPP in Turkey will be equipped with an automated monitoring system for water discharged into the Mediterranean Sea after cooling the turbine condensers. This upgrade aligns with the recent changes in Turkish regulatory requirements and enhances environmental sustainability of the entire facility. The system will remotely monitor the flow rate and purity of discharged water, including suspended solids, dissolved oxygen, pH levels, chemical oxygen demand, temperature, conductivity, and other critical parameters. It will remain operational throughout the service life of the nuclear power plant. The Akkuyu NPP, being built by Rosatom, will have four power units featuring Russian-designed Generation III+ VVER reactors.