Generator stator was installed at Rooppur NPP Unit 1 in Bangladesh. This is the heaviest element of the power unit’s equipment weighing more than 440 tons. The next stage is full-scale work on the installation of the main equipment of the turbine hall. Recently, a cargo ship with a new batch of equipment on board for units 1&2 with a total weight of 1573 tons left the Russian port of St. Petersburg. The cargo is expected to be delivered in June.