BN-800 Passed Final Tests
Subscribe to the newsletter
Select the region you are interested in and enter your e-mail
Subscribe
#144September 2016

BN-800 Passed Final Tests

back to contents

Its functional performance was verified, and the reactor was proved to be capable of operating as designed. This signaled the completion of reactor tests, with commercial operation being only a few steps away. Representatives of Russian regulator Rostechnadzor will inspect the reactor and give a final opinion on the unit’s compliance with the design. If the opinion is positive, Rosatom will obtain a permit to put the reactor in commercial operation. All the activities are scheduled to be completed by the end of September.